Category: Uncategorized

  • How Much Does a First-in-Human Trial Cost in Latin America vs the United States?

    How Much Does a First-in-Human Trial Cost in Latin America vs the United States?

    If you're a MedTech or biopharma founder with a fixed budget earmarked for your first-in-human milestone, where you run the trial matters as much as how you design it. The same protocol can carry dramatically different price tags depending on geography — and the gap isn't just about per-patient rates. It's about regulatory timelines, site activation delays, and the compounding cost of time when you're burning runway.

    This article breaks down the real cost drivers behind a first-in-human medical device trial in the United States versus Latin America, so you can make a more informed decision before issuing an RFP.


    Why Medical Device Clinical Trial Cost Varies So Much

    A first-in-human trial isn't a single line item. Total cost is the sum of several distinct cost centers, and each one behaves differently depending on where you run the study.

    The main buckets are:

    • Regulatory and ethics approval fees and timelines
    • Site activation costs (qualification, contracting, training)
    • Per-subject costs (screening, procedures, follow-up, stipends)
    • CRO management fees (project management, monitoring, data management)
    • Clinical study report and submission preparation
    • Overhead from delays (extended site management, sponsor team time, investor timeline pressure)

    That last item is the one founders most consistently underestimate. A six-month regulatory delay in the US doesn't just cost you six months of CRO fees. It costs you six months of burn rate, a potentially missed funding milestone, and the compounding risk of a competitor reaching clinical data first.


    The US Baseline: What a First-in-Human Trial Costs Domestically

    Running a first-in-human medical device study in the United States under an IDE means navigating FDA review, IRB approval, and site contracting at academic medical centers or specialized Phase I clinics. None of those steps move quickly.

    Regulatory and IRB timelines

    FDA IDE review alone takes 30 days for a non-significant risk determination and up to 180 days for a significant risk device. IRB review at a single institution typically adds another 30–90 days. Multi-site studies multiply that burden. In practice, US sponsors routinely spend 6–12 months in the pre-enrollment phase before a single patient is screened.

    Per-subject costs in North America

    Per-subject cost in a US first-in-human study depends on device complexity, procedure intensity, imaging and core lab requirements, the number and length of follow-up visits, and site overhead at academic medical centers. Subject-related costs scale with every enrolled patient and every screen failure, and they come before contract research organization (CRO) fees, site management, or data work.

    CRO and operational overhead

    Large US CROs typically scope FIH engagements across multiple internal teams: regulatory affairs, clinical operations, data management, and medical writing each operate as separate cost centers. Sponsors coordinate across those silos, which adds both cost and timeline risk. For a medical device study with meaningful complexity, that structure makes a full-service FIH engagement through a major US CRO one of the largest lines in the budget.

    The timeline tax

    At a typical seed-to-Series-B burn rate, 18–24 months of US trial execution represents a material portion of a funding round. If your Series A closes in Q3 and your board expects first human data before your Series B roadshow, a 24-month US timeline doesn't fit. That gap is where Latin America stops being operationally interesting and starts being financially necessary.


    Latin America: Where the Cost Advantage Actually Lives

    The cost advantage of running a first-in-human trial in Latin America is real — but it's more nuanced than a simple per-patient discount. The advantage compounds across three separate dimensions.

    Regulatory speed in specific jurisdictions

    Not all Latin American countries offer the same regulatory environment. In Panama, El Salvador, Chile, and the Dominican Republic, ethics and regulatory approvals are observed in 30–90 days. That's not a general claim about the region — it's specific to those four jurisdictions and the regulatory bodies that govern them: MINSA/CNBI in Panama, ISP/MINSAL in Chile, and SRS/CNEIS in El Salvador.

    Compare that to 6–12 months in the US. For a founder on a 12–18 month runway, that difference can determine whether you hit a milestone or miss it.

    Other Latin American markets — Argentina, Brazil, Colombia, Mexico, Peru — carry longer regulatory timelines that narrow or eliminate this advantage. Jurisdiction selection is not interchangeable.

    Site activation and per-subject economics

    Pre-qualified sites in Panama, El Salvador, Chile, and the Dominican Republic operate with lower overhead than US academic medical centers. Site activation timelines are shorter, contracting is more straightforward, and per-subject costs reflect a different economic baseline — producing meaningfully lower cost per enrolled subject compared to North American Phase I clinic rates.

    This doesn't mean lower quality. Sites operating under ICH-GCP standards and ISO 14155 protocol architecture produce data that meets FDA requirements for foreign clinical data acceptance under 21 CFR 812.28. The cost savings don't come at the expense of regulatory usability.

    The compounding value of 12 months vs. 24 months

    If a US trial takes 18–24 months and a structured Latin America program delivers a submission-ready evidence package within 12 months, the cost comparison isn't just about per-patient rates. It's about total capital consumed during the trial period.

    A 12-month program means:

    • Fewer months of CRO management fees
    • Less sponsor team time allocated to trial oversight
    • A faster path to the data package that unlocks the next funding round
    • Lower risk of timeline-driven dilution or bridge financing

    For a startup with a fixed allocation for the FIH milestone, every extra month of program time draws on the same budget through management fees, sponsor team time, and site maintenance — before you account for per-subject cost differences.


    What Drives Cost Differences at the Program Level

    Beyond geography, the structure of your CRO engagement has a significant impact on total cost. Two variables matter most.

    Single-vendor vs. multi-vendor coordination

    When a sponsor coordinates across separate regulatory, clinical operations, data management, and medical writing vendors, every handoff creates cost and delay. Scope gaps between vendors generate change orders. Misaligned timelines create idle time that still gets billed.

    A single-vendor engagement — where one accountable team manages all workstreams from protocol development through final clinical study report — eliminates most of that friction. The savings from reduced coordination overhead are real, even if they're harder to quantify on a line-item basis than per-subject rates.

    Packaged vs. bespoke scoping

    Large CROs typically scope FIH studies from scratch, which means weeks of back-and-forth on protocol, budget, and timeline before a contract is signed. A structured program with defined workstreams and a fixed timeline framework reduces pre-contract friction and gives sponsors a clearer picture of total program cost before they commit.


    How bioaccess® Structures the Cost Comparison

    bioaccess® operates specifically in Panama, El Salvador, Chile, and the Dominican Republic — the four jurisdictions where 30–90 day regulatory approvals are achievable. Its FIH-12™ program is a nine-workstream engagement that takes a sponsor from protocol development to a submission-ready evidence package within 12 months, managed by one accountable team.

    That structure addresses both the geographic cost advantage and the coordination overhead problem at once. Sponsors don't manage separate regulatory, clinical, and data vendors. One team handles FDA strategy alignment, protocol development, site activation, patient enrollment, data management, and final clinical study report delivery — start to finish.

    The program is built specifically for seed-to-Series-B startups whose capital cycles don't accommodate 18–24 month US timelines. All data is structured for FDA acceptance under 21 CFR 812.28, so the evidence package produced in Latin America is directly usable for US IDE and IND submissions.

    Pricing is not publicly disclosed. bioaccess® offers a FIH Launch Planner — a six-question tool that generates a preliminary country route, timeline range, and evidence package estimate based on your device class. Intake is limited to 8 new programs per quarter.


    A Practical Cost Framework for Founders

    If you're building a budget for your FIH milestone, here's how the two paths compare:

    US-based FIH trial (IDE pathway):

    • Regulatory and IRB timeline: 6–12 months pre-enrollment
    • Per-subject costs: driven by device complexity, procedure intensity, imaging, follow-up length, and academic site overhead
    • CRO management: typically scoped across multiple internal teams
    • Total program timeline: 18–24 months common for medical device FIH studies
    • Data usability: directly FDA-applicable

    Latin America FIH trial (bioaccess® FIH-12™, specific jurisdictions):

    • Regulatory and ethics timeline: 30–90 days in Panama, El Salvador, Chile, Dominican Republic
    • Per-subject costs: lower than North American baseline given site economics
    • CRO management: single-vendor, nine-workstream accountability
    • Total program timeline: 12 months under the FIH-12™ structured program
    • Data usability: FDA-accepted under 21 CFR 812.28

    The decision isn't purely about cost per subject. It's about total capital consumed, how well the timeline fits your funding cycle, and the risk profile of each path.


    FAQs

    Is data from a Latin American first-in-human trial accepted by the FDA?

    Yes, when structured correctly. The FDA accepts foreign clinical data under 21 CFR 812.28, provided the study meets applicable standards. bioaccess® structures all FIH data under ICH-GCP and ISO 14155 protocol architecture specifically to meet this requirement, making the evidence package usable for US IDE and IND submissions.

    Why are regulatory approvals faster in Panama, El Salvador, Chile, and the Dominican Republic than in the US?

    These jurisdictions have streamlined ethics and regulatory review processes that operate on 30–90 day timelines. This is specific to these four countries and the regulatory bodies governing them — MINSA/CNBI in Panama, ISP/MINSAL in Chile, and SRS/CNEIS in El Salvador. It does not apply to Latin America broadly; markets like Brazil or Argentina carry longer timelines.

    What drives per-subject cost in a first-in-human device trial?

    Per-subject cost depends on device complexity, procedure intensity, imaging and core lab requirements, the number and length of follow-up visits, screen failure rates, and site overhead. Import and logistics for the investigational device and clinical trial insurance add to the study total. Ask any CRO to itemize these drivers so proposals can be compared line by line.

    Does running a trial in Latin America mean lower data quality?

    No. Sites operating under ICH-GCP standards and ISO 14155 protocol architecture meet the same quality standards required for FDA submission. The cost difference reflects site economics — not a reduction in data integrity or regulatory usability.

    What is the FIH-12™ program and how does it affect total trial cost?

    FIH-12™ is bioaccess®'s structured nine-workstream program that delivers a submission-ready evidence package within 12 months. Because one team manages all workstreams — from FDA strategy alignment through final clinical study report — sponsors avoid the coordination overhead and change order risk that comes with multi-vendor engagements. That structure affects total cost as much as per-subject rates do.

    How does the 12-month timeline affect startup fundraising?

    Most seed-to-Series-B MedTech founders need first human data before their next funding round closes. A 12-month program fits within a typical Series A-to-Series-B window. An 18–24 month US timeline often doesn't, which forces founders into bridge financing or timeline compression — both of which carry their own costs and risks.

    How do I get a cost estimate for a Latin American FIH trial?

    bioaccess® does not publish pricing publicly. The FIH Launch Planner on the website generates a preliminary country route, timeline range, and evidence package estimate based on six questions about your device class and program stage. Intake is limited to 8 new programs per quarter.


    Make the Cost Comparison Before You Commit

    The cost of a first-in-human trial isn't fixed by your protocol. It's shaped by where you run it, how your CRO is structured, and how well the program timeline fits your capital cycle.

    If you're 12–24 months from needing first human data and your funding window doesn't accommodate a 24-month US timeline, the Latin America comparison is worth running in detail — not as a fallback, but as a primary strategic option.

    Use the FIH Launch Planner at bioaccessla.com to get a preliminary country route and timeline estimate for your specific device class.

  • Clinical Trial Budget Planning for Medical Device Startups: What Drives Cost in a FIH Study

    Clinical Trial Budget Planning for Medical Device Startups: What Drives Cost in a FIH Study

    Planning a clinical trial budget is one of the most consequential decisions a medical device startup makes before first-in-human work begins. Get it right, and you protect your runway while hitting the data milestone your next funding round depends on. Get it wrong, and you either burn cash on delays or arrive at your Series B with incomplete evidence.

    This article breaks down the real cost drivers in a first-in-human (FIH) medical device study — where budgets tend to slip, and how geography and program structure affect what you actually spend.


    Why FIH Budgets Are Hard to Estimate Early

    Most founders underestimate FIH costs because they anchor on a single line item — usually the CRO fee — and treat everything else as rounding error. In practice, that fee is only one component of a budget that spans regulatory strategy, site operations, patient enrollment, data management, and submission preparation.

    The other common mistake is treating a US-based CRO quote as the only benchmark. US trial infrastructure carries a cost structure built for large pharma programs. When a startup with $2 million allocated for FIH work receives a quote sized for a 24-month, multi-site Phase I at a US academic medical center, the numbers rarely fit.


    The Major Cost Drivers in a Medical Device FIH Study

    1. Regulatory Strategy and Pre-Submission Work

    Before a single patient is enrolled, you need a clear FDA pathway and a protocol that will generate data FDA will accept. That means Pre-Sub meetings, IDE preparation where applicable, and protocol architecture aligned to your 510(k), De Novo, PMA, or HDE route.

    This workstream is consistently underbudgeted because it feels like planning rather than execution. But a protocol that misaligns with your intended regulatory pathway can force an amendment mid-study — and amendments cost both time and money. Solid regulatory strategy work at the front end is one of the most cost-efficient investments in the entire budget.

    2. Ethics and Regulatory Approval Timelines

    Approval timelines directly affect burn rate. Every month your study sits in a regulatory queue is a month of overhead, staff time, and deferred data.

    In the US and EU, ethics and regulatory approvals typically take 6 to 12 months. In Panama, El Salvador, Chile, and the Dominican Republic, the same approvals are observed in 30 to 90 days. That difference alone can represent several hundred thousand dollars in carrying costs for a startup maintaining a standing team, device inventory, and site readiness while waiting.

    Geography is a budget variable, not just a logistics preference.

    3. Site Activation and Investigator Fees

    Site activation covers site qualification, contract negotiation, ethics submissions at the site level, and investigator training. For a multi-site study, these costs multiply quickly.

    Investigator fees vary significantly by country and specialty. Device trials requiring surgical implantation or specialized procedural skills command higher per-procedure fees than simpler interventional studies. Budgeting accurately here requires knowing your device category, the investigator profile the protocol demands, and the site's patient volume in your target indication.

    Working with a network of pre-qualified sites reduces activation time and can lower the cost of feasibility work. A CRO with established site relationships doesn't need to rebuild that infrastructure from scratch for each new sponsor.

    4. Patient Enrollment

    Enrollment is where most FIH budgets experience their largest unplanned overruns. The primary causes are overly optimistic enrollment rate assumptions and underestimated screen failure rates.

    Eligibility criteria in medical device FIH studies tend to be narrow. You may need a specific anatomical profile, disease severity range, or prior treatment history. Screen failure rates of 30 to 50 percent are common. If your budget assumes a one-to-one screening-to-enrollment ratio, you will run out of money before you hit your sample size.

    Enrollment costs include patient stipends, screening visits, protocol-required diagnostics, and site staff time per patient contact. In jurisdictions with strong patient availability for your indication and experienced site coordinators, these costs are lower and enrollment moves faster.

    5. Data Management and EDC

    Electronic data capture setup, data entry, query resolution, and database lock are both fixed and variable costs that scale with protocol complexity and visit count. A lean protocol with fewer endpoints and fewer visits costs less to manage than a heavily instrumented study.

    This is worth considering at the protocol design stage. Every additional data collection point adds cost downstream. Protocol authors who haven't managed data operations often add endpoints that sound useful but are expensive to collect and never appear in the final submission package.

    6. Safety Monitoring and Adverse Event Reporting

    For a first-in-human study, safety monitoring is non-negotiable. This includes a Data Safety Monitoring Board or equivalent independent review, Medical Monitor fees, and the infrastructure to capture, adjudicate, and report adverse events in compliance with ICH-GCP and ISO 14155 standards.

    Adverse event reporting workflows that are well-structured from the outset cost less to operate than those assembled after enrollment begins.

    7. Clinical Study Report and Submission Package

    The end product of a FIH study is not raw data. It is a clinical study report and an organized data room structured for your next FDA regulatory step. Under FDA 21 CFR 812.28, foreign clinical data collected under the appropriate framework is accepted for US IDE and IND submissions — but the data must be organized and presented in a format FDA can use.

    Sponsors who treat the CSR as an afterthought often face significant cost and time reconstructing documentation that should have been captured prospectively. Building the submission package into the program from day one keeps this cost predictable.


    How Program Structure Affects Total Cost

    The difference between a structured FIH program and a fragmented vendor approach is meaningful from a budget standpoint.

    When a sponsor coordinates regulatory consultants, a CRO, a site management organization, a data management vendor, and a medical writer as separate contracts, they pay for the overhead of managing all those relationships. Each vendor has its own scope boundaries, change order process, and communication overhead. Gaps between vendor scopes become the sponsor's problem to resolve — and resolving them costs money.

    A single-vendor program covering all workstreams under one engagement eliminates that coordination tax. It also makes the budget more predictable because scope is defined once, not renegotiated across five separate contracts.

    bioaccess® structures its FIH-12™ program around nine workstreams managed by one accountable team — from FDA strategy alignment and protocol development through site activation, enrollment, data management, and final submission-ready evidence package delivery. The 12-month timeline is designed to fit within a startup's capital cycle between funding rounds.


    Geography as a Budget Variable

    Running a FIH study in the US is not inherently more rigorous than running one in a jurisdiction with faster approvals. What matters is whether the data is collected under a framework FDA will accept and whether the protocol architecture meets the applicable standard.

    Under FDA 21 CFR 812.28, clinical data collected outside the US is accepted for US regulatory submissions when the study meets applicable requirements. Protocols built to ISO 14155 architecture, with ACRP-certified clinical operations, produce data that travels to FDA submissions.

    The budget implication is direct. A 30 to 90-day approval window in Panama, El Salvador, Chile, or the Dominican Republic versus a 6 to 12-month window in the US means a faster enrollment start, lower carrying costs, and a submission-ready dataset delivered within a timeline that aligns with your next funding milestone.


    Common Budget Mistakes to Avoid

    Anchoring on a single line item. The CRO fee is visible; site costs, regulatory delays, and screen failure overruns are not. Budget for the full program, not just the contract.

    Underestimating screen failures. Build a realistic screen failure assumption into your enrollment budget from the start. For most device FIH studies, plan for at least a 2:1 screening-to-enrollment ratio.

    Treating submission preparation as separate. The CSR and data room are part of the study, not a separate project. If your budget doesn't include them, your total cost estimate is incomplete.

    Ignoring approval timeline costs. A 9-month regulatory queue is not free. It carries a real cost in staff time, site readiness, and deferred data. Factor approval timelines into your total program cost, not just your CRO fee.

    Choosing a CRO by lowest fee. A low CRO fee attached to a 24-month timeline and fragmented workstreams may cost more in total than a higher fee attached to a 12-month structured program with single-vendor accountability.


    Building a Budget That Fits Your Capital Cycle

    For seed-to-Series-B medical device startups, the FIH budget is not purely a clinical operations question — it is a capital strategy question. The goal is a submission-ready dataset before your next funding round closes, delivered within the $1 million to $5 million range most early-stage programs are working with.

    That requires a program structure where timeline, scope, and cost are defined together, not independently. It requires a geography where approvals don't consume half your runway. And it requires a CRO that can deliver the full evidence package, not just enrollment.

    The early-phase CRO services market reached USD 6.73 billion in 2026 per Mordor Intelligence, reflecting how central this decision has become for life sciences startups. Choosing the right program structure and jurisdiction is one of the highest-leverage decisions in that market.

    If you are at the stage of building your FIH budget, the bioaccess® FIH Launch Planner generates a preliminary country route, timeline range, and evidence package estimate from six sponsor inputs — a practical starting point before you issue an RFP.


    FAQs

    What is a realistic budget range for a medical device FIH study?
    Most medical device FIH studies at seed-to-Series-B startups fall in the $1 million to $5 million range, depending on device complexity, sample size, number of sites, and the jurisdiction where the study runs. This range covers regulatory strategy, site activation, enrollment, data management, and submission preparation.

    Does running a FIH study in Latin America cost less than running one in the US?
    Geography affects both direct costs and timeline costs. In Panama, El Salvador, Chile, and the Dominican Republic, regulatory approvals take 30 to 90 days versus 6 to 12 months in the US. Faster approvals reduce carrying costs and get you to enrollment sooner, which affects total program cost in a meaningful way.

    Will FDA accept data from a FIH study conducted in Latin America?
    Under FDA 21 CFR 812.28, clinical data collected outside the US is accepted for US IDE and IND submissions when the study meets applicable requirements. Protocols built to ISO 14155 architecture and conducted under ICH-GCP standards produce data that supports US regulatory submissions. FDA acceptance of foreign clinical data under this framework is not unconditional approval of the trial itself, but the pathway is well-established.

    What causes FIH clinical trial budgets to overrun?
    The most common causes are underestimated screen failure rates, regulatory approval delays that extend carrying costs, scope gaps between fragmented vendors, and treating submission preparation as a separate project rather than part of the study budget.

    How does a single-vendor CRO program affect budget predictability?
    When one team manages all workstreams under a single engagement, scope is defined once and change orders are less frequent. Fragmented vendor models require sponsors to manage scope boundaries across multiple contracts, which creates cost exposure that is difficult to budget in advance.

    What is the minimum sample size for a medical device FIH study?
    There is no universal minimum. Sample size depends on your regulatory pathway, the endpoints you need to support, and the statistical requirements of your protocol. IDE feasibility studies often enroll 10 to 30 subjects, while studies supporting a 510(k) or De Novo may require larger cohorts. Your protocol architecture and FDA pathway determine the number.

    When should a startup start planning its FIH budget?
    Ideally 12 to 24 months before you need first human data. That window allows time for regulatory strategy alignment, protocol development, site selection, and approval processes without compressing your timeline. Starting budget planning after IDE approval or a Series A close is common, but it leaves less margin for adjustment.


    Planning your clinical trial budget well before you need it is not excessive caution — it is how startups protect their runway and arrive at their next funding milestone with the data they promised. The decisions you make on program structure, geography, and vendor accountability shape not just what you spend, but whether you spend it on time.

  • PMA Meaning: When a Medical Device Requires the Most Rigorous FDA Approval Pathway

    PMA Meaning: When a Medical Device Requires the Most Rigorous FDA Approval Pathway

    If you're developing a high-risk medical device and someone tells you it needs a PMA, that's not a minor regulatory detail. It means your path to US market clearance will require the most demanding clinical evidence package the FDA asks for. Understanding what PMA means, when it applies, and what it actually demands from a clinical program is foundational for any MedTech founder planning their development timeline and capital strategy.

    What PMA Means

    PMA stands for Premarket Approval. It's the FDA's regulatory mechanism for Class III medical devices — those that sustain or support human life, are implanted in the body, or present a potential unreasonable risk of illness or injury.

    Unlike the 510(k) pathway, which clears a device based on substantial equivalence to a predicate, PMA requires the sponsor to independently demonstrate that the device is safe and effective. The FDA isn't comparing your device to something already on the market. It's evaluating the scientific evidence you generate entirely on its own merits.

    That distinction has significant consequences for clinical planning. A 510(k) submission can sometimes rely on bench testing and limited clinical data. A PMA application typically requires a full pivotal clinical trial with statistically powered endpoints — often preceded by first-in-human feasibility data to support the pivotal design.

    Which Devices Require PMA

    Class III is the operative classification. Devices automatically placed in Class III include those that are life-sustaining, life-supporting, or implanted, and for which there's insufficient information to determine that general controls and performance standards would provide reasonable assurance of safety and effectiveness.

    Common examples include:

    • Implantable cardiac defibrillators
    • Left ventricular assist devices
    • Cochlear implants
    • Certain neurostimulation systems
    • High-risk ophthalmic implants
    • Novel vascular grafts without a predicate

    A device can also be required to go through PMA if it was originally classified as Class III at the time of the Medical Device Amendments of 1976, or if a De Novo classification request is denied and the device remains Class III.

    If you're unsure of your device's classification, the FDA's product code database and a Pre-Submission (Pre-Sub) meeting are the right starting points. Misclassifying your device early creates downstream risk that compounds as your program advances.

    The PMA Application: What It Actually Contains

    A complete PMA submission is a substantial document. The FDA reviews it against a defined set of required elements, and any deficiency can trigger a Major Deficiency letter that resets the review clock.

    The core components include:

    Device description and manufacturing information. Full technical documentation covering design specifications, materials, manufacturing processes, and quality system compliance.

    Non-clinical laboratory studies. Bench testing, biocompatibility data, electrical safety, software validation, and animal study results. These preclinical studies establish the safety foundation before any human exposure.

    Clinical investigation data. This is the weight-bearing component of most PMA applications. The FDA expects data from well-controlled clinical studies demonstrating that the device performs as intended in the target patient population. The clinical data section must include the study protocol, IRB approvals, patient demographics, primary and secondary endpoint results, adverse event reporting, and a complete clinical study report.

    Risk-benefit analysis. A structured analysis showing that the probable benefits of the device outweigh its probable risks for the intended use population.

    Proposed labeling. Draft instructions for use, indications, contraindications, warnings, and precautions.

    References. Published literature supporting the scientific rationale and clinical context.

    The FDA has 180 days to review a PMA application once it's accepted as complete — though the actual timeline from submission to approval is typically longer when you account for deficiency responses and panel meetings.

    The Role of First-in-Human Data in a PMA Program

    Most PMA-track devices don't go straight from animal studies to a pivotal trial. The standard development arc includes an early feasibility or first-in-human (FIH) study that generates initial safety and performance data in a small patient cohort, followed by a pivotal trial designed with the statistical power to support the PMA application.

    The FIH study serves several functions. It confirms the device can be safely used in humans at all. It surfaces any unexpected adverse events that need to be addressed before scaling enrollment. It generates preliminary effectiveness signals that inform pivotal endpoint selection. And it produces the clinical evidence needed to support an IDE application for the pivotal trial — or to refine an existing one.

    For startups on a Series A or Series B timeline, the FIH study is often the most capital-efficient milestone to hit before the next funding round. Investors want to see human data. A FIH dataset is what moves a device from "promising preclinical results" to "de-risked asset with clinical proof of concept."

    The challenge is that running a FIH study in the US takes time. Ethics and regulatory approvals typically require 6–12 months before the first patient is enrolled. For a founder with 18 months of runway and a board milestone tied to a pivotal trial start, that timeline is a serious constraint.

    Why Sponsors Running PMA-Track Devices Look Beyond the US for FIH Studies

    FDA regulations under 21 CFR 812.28 explicitly permit the use of foreign clinical data in IDE and PMA submissions, provided the data was collected under conditions comparable to FDA standards and the studies were conducted in accordance with Good Clinical Practice.

    This isn't a workaround. It's a documented regulatory framework that allows PMA-track sponsors to generate FIH data in jurisdictions with faster approval timelines, then use that data to support their US regulatory submissions.

    Latin America has become a recognized jurisdiction for this purpose. Panama, El Salvador, Chile, and the Dominican Republic have ethics and regulatory review processes that operate on 30–90-day timelines — compared to the 6–12 months typical in the US. That difference can compress a FIH program by six months or more, which is material when your next funding round has a defined close date.

    bioaccess® manages FIH clinical trials specifically for MedTech and Biopharma startups across these four jurisdictions. Its FIH-12™ program is a structured 9-workstream engagement designed to take a sponsor from protocol development to a submission-ready clinical evidence package within 12 months. Every study is aligned to the sponsor's intended US regulatory pathway from day one — PMA, IDE, 510(k), De Novo, or HDE — so the final data package is built for the sponsor's next FDA step.

    PMA vs. Other FDA Pathways: A Practical Comparison

    Understanding where PMA sits relative to other pathways helps clarify when it applies and when an alternative might be available.

    Pathway Device Class Clinical Evidence Required Typical Timeline
    510(k) Class II (mostly) Substantial equivalence to predicate; clinical data often limited 3–12 months
    De Novo Class II (novel) Performance data; clinical data may be required 12–24 months
    PMA Class III Independent clinical trial demonstrating safety and effectiveness 3–7+ years total program
    HDE Class III (rare disease) Probable benefit; less rigorous than full PMA Similar to PMA but with lower evidence threshold

    The Humanitarian Device Exemption (HDE) is worth noting for sponsors developing devices for conditions affecting fewer than 8,000 patients per year in the US. The evidence threshold is lower than a full PMA, but the pathway is only available for qualifying rare disease indications.

    If your device is Class III but has a predicate cleared before the 1976 amendments, a 510(k) may still be available. That's a nuanced determination that requires Pre-Sub engagement with the FDA.

    What Makes a PMA Clinical Program Succeed

    The FDA's standard for PMA approval is "reasonable assurance of safety and effectiveness." That phrase sounds straightforward, but translating it into a clinical program that actually meets the standard requires several things to be true at once.

    Endpoint selection must be clinically meaningful and measurable. The FDA won't approve a device based on surrogate endpoints alone if direct clinical benefit endpoints are feasible. Choosing endpoints that are both scientifically valid and practically achievable in your patient population is one of the most consequential decisions in PMA program design.

    The study population must reflect the intended use population. Enrollment criteria that are too narrow produce data the FDA may not accept as generalizable. Criteria that are too broad create heterogeneity that obscures the safety and effectiveness signal.

    Adverse event reporting must be complete and transparent. PMA reviewers scrutinize adverse event data closely. Incomplete or inconsistently reported events are a common source of Major Deficiency letters.

    The clinical study report must be organized for FDA review. A PMA application isn't just a collection of data — it's a structured argument that the evidence supports approval. The clinical study report and supporting data room need to be organized in a way that makes the FDA reviewer's job tractable.

    For startups, this last point is frequently underestimated. A well-organized, submission-ready evidence package can meaningfully accelerate FDA review. A disorganized one adds months to the process.

    Planning Your PMA Timeline as a Startup

    A full PMA program from FIH study to approval typically spans several years. That doesn't mean every phase needs to move at the same pace. The FIH and early feasibility phases are where startups have the most flexibility to compress timelines, because the regulatory approval bottleneck is shorter and enrollment numbers are smaller.

    A realistic planning framework for a PMA-track device looks something like this:

    1. Pre-clinical completion and design freeze. Bench testing, biocompatibility, and animal studies complete. Design locked.
    2. Pre-Sub meeting with FDA. Confirm classification, discuss IDE requirements, and align on the clinical evidence needed for PMA.
    3. FIH / early feasibility study. Small cohort — typically 5–30 patients — to establish initial safety and performance data. This is where Latin American jurisdictions with 30–90-day approval timelines offer a meaningful speed advantage.
    4. IDE application for pivotal trial. FIH data supports the IDE. FDA review takes approximately 30 days for non-significant risk determinations, or up to 30 days after receipt for significant risk devices.
    5. Pivotal clinical trial. Statistically powered enrollment. This is the weight-bearing clinical phase for the PMA application.
    6. PMA submission and review. 180-day statutory review period, plus time for deficiency responses.

    Founders who treat the FIH study as a capital-efficient milestone — rather than a regulatory formality — tend to enter the pivotal phase with better data, a more refined protocol, and a stronger investor narrative.


    FAQs

    What does PMA stand for in medical devices?
    PMA stands for Premarket Approval. It's the FDA's most rigorous review process for Class III medical devices, requiring the sponsor to independently demonstrate that the device is safe and effective through clinical evidence — not by showing equivalence to a predicate device.

    What is the difference between a 510(k) and a PMA?
    A 510(k) clears a device based on substantial equivalence to a legally marketed predicate. A PMA requires the sponsor to generate original clinical evidence demonstrating safety and effectiveness. PMA applies to Class III devices; 510(k) applies primarily to Class II. The evidentiary burden and timeline for PMA are substantially higher.

    Does a PMA application require a clinical trial?
    In most cases, yes. PMA applications for novel Class III devices typically require data from at least one well-controlled clinical investigation. For many devices, the program includes an early feasibility or first-in-human study followed by a pivotal trial with statistically powered enrollment.

    Can foreign clinical data be used in a PMA submission?
    Yes. Under FDA 21 CFR 812.28, foreign clinical data may support a PMA application if it was collected under conditions comparable to FDA standards and the study was conducted in accordance with Good Clinical Practice. This is a documented regulatory framework, not an exception.

    How long does PMA approval take?
    The FDA has a 180-day statutory review period once a PMA application is accepted as complete. The total time from initial FIH study to PMA approval — including all clinical phases — typically spans several years, depending on device complexity, enrollment timelines, and the number of deficiency cycles during review.

    What is a Humanitarian Device Exemption (HDE) and how does it differ from PMA?
    An HDE is a pathway for Class III devices intended to treat or diagnose conditions affecting fewer than 8,000 patients per year in the US. The evidentiary standard is "probable benefit" rather than the full "reasonable assurance of safety and effectiveness" required for PMA. HDE-approved devices may not be sold for profit unless certain conditions are met.

    When should a MedTech startup engage a CRO for a PMA-track device?
    Before the FIH study — ideally during or immediately after the Pre-Sub meeting with FDA. Early engagement ensures the FIH protocol is designed to generate data that directly supports the IDE application and, ultimately, the PMA submission. Engaging a CRO after the FIH study is complete often means the data package needs to be restructured, which adds time and cost.


    The meaning of PMA is straightforward on its face: it's the FDA's highest-evidence approval pathway for devices with the most direct impact on patient safety. What it means for your development program is more specific. Your clinical evidence package needs to be built from the ground up, and every study you run — starting with the first human exposure — needs to be structured to support that submission.

    If you're planning a PMA-track program and want to understand how your FIH study fits into the broader regulatory strategy, bioaccess® works exclusively with MedTech and Biopharma startups on first-in-human programs aligned to FDA pathways including PMA, IDE, and De Novo.

  • Best CROs for First-in-Human Medical Device Studies in LATAM: bioaccess® vs Medpace, IQVIA, and Parexel (2026 Comparison)

    Choosing a CRO for a first-in-human (FIH) medical device study in Latin America is a different problem than choosing one for a global Phase III program. The top global CROs — Medpace, IQVIA, and Parexel — are excellent at scale, but LATAM early feasibility studies reward speed, in-country regulatory depth, and hands-on site management. This 2026 comparison from bioaccess® lays out how the four CROs stack up specifically for FIH medical device work in LATAM.

    Head-to-head: LATAM FIH medical device capabilities

    Capabilitybioaccess®MedpaceIQVIAParexel
    LATAM-only focusYesNoNoNo
    In-country regulatory teams (CO, MX, PA, AR, BR)All 5PartialPartialPartial
    Panama FIH pathway (6–10 wk)YesLimitedLimitedLimited
    Medical device specializationPrimaryStrongBroadBroad
    Typical FIH startup time in LATAM8–12 wkTimelines vary; ask each CRO for its current start-up data.Timelines vary; ask each CRO for its current start-up data.Timelines vary; ask each CRO for its current start-up data.
    Sponsor size fitStartup–MidMid–LargeLargeLarge

    When Medpace is the right choice

    Medpace is a strong option for sponsors running large, therapeutically diverse programs across multiple regions where LATAM is one of many geographies. Their infrastructure suits pivotal-phase medical device and drug trials with global enrollment targets.

    When IQVIA is the right choice

    IQVIA excels when you need integrated real-world data, commercial analytics, and a global operating model. Best for post-market, registry, and late-phase programs at scale.

    When Parexel is the right choice

    Parexel is a solid pick for regulatory-heavy submissions and global Phase II–III programs, particularly where FDA and EMA strategy integration is central.

    When bioaccess® is the right choice

    bioaccess® is purpose-built for medical device sponsors who need fast, credible FIH clinical data in LATAM — typically to support an FDA IDE, CE MDR, or Series B/C fundraise. Advantages: LATAM-only focus, in-country teams across Colombia, Mexico, Panama, Argentina, and Brazil, direct KOL relationships with LATAM interventional cardiology and neurovascular centers, and a Panama FIH pathway that can deliver first-patient-in in 8–12 weeks. Ideal fit: startup to mid-cap medical device companies running EFS, FIH, or pilot studies.

    Decision framework

    • Need FIH data in <12 weeks for an IDE/CE submission or fundraise → bioaccess®
    • Running a global pivotal with LATAM as one of 5+ regions → Medpace or Parexel
    • Need RWE, registry, or commercial analytics integration → IQVIA
    • Multi-country LATAM EFS with tight budget and hands-on PM → bioaccess®

    Talk to bioaccess®

    If your medical device program needs LATAM FIH data on a startup timeline, book a scoping call with our team. We’ll benchmark your protocol against comparable studies we’ve run in Colombia, Panama, and Mexico and give you a realistic timeline in one call.

  • How to Obtain ANVISA, COFEPRIS, ANMAT, and Panama MINSA Approval for a Medical Device Clinical Trial: A 2026 LATAM Multi-Country Guide

    Running a medical device clinical trial across Latin America means navigating four very different regulatory pathways — ANVISA (Brazil), COFEPRIS (Mexico), ANMAT (Argentina), and Panama MINSA. This 2026 guide from bioaccess®, a LATAM-focused CRO, breaks down submission requirements, realistic timelines, documentation, and the sequencing strategy sponsors use to run efficient multi-country early feasibility and pivotal studies.

    Quick comparison: ANVISA vs COFEPRIS vs ANMAT vs Panama MINSA

    AgencyCountryTypical CT approval timeEthics reviewImport license
    ANVISABrazil6–12 monthsCONEP + local CEPYes (LI)
    COFEPRISMexico3–6 monthsLocal IRB + COFEPRISYes
    ANMATArgentina4–8 monthsLocal IRB + jurisdictionalYes
    Panama MINSAPanama6–10 weeksCNBI + local IRBYes

    ANVISA (Brazil) medical device clinical trial approval

    ANVISA requires a Dossiê de Investigação Clínica de Dispositivo Médico (DICD) submission alongside CONEP ethics review. Sponsors must appoint a Brazilian legal representative and secure an import license (LI) for the investigational device. Expect 6–12 months end-to-end, with CONEP typically the critical-path node.

    COFEPRIS (Mexico) medical device clinical trial approval

    COFEPRIS runs a parallel scientific and ethics review. A Mexican sponsor representative and a certified local IRB are mandatory. Class III and implantable devices typically clear in 3–6 months. Import permits are issued per-shipment against the approved protocol.

    ANMAT (Argentina) medical device clinical trial approval

    ANMAT Disposición 4306/99 (and successor guidance) governs medical device trials. Provincial health authorities also review at the jurisdictional level, so timelines vary by province. Buenos Aires City and Province tend to be fastest. Plan 4–8 months from first submission to first-patient-in.

    Panama MINSA medical device clinical trial approval

    Panama is the LATAM speed play for early feasibility studies. MINSA’s Comité Nacional de Bioética de la Investigación (CNBI) plus a local IRB can deliver approval in 6–10 weeks for well-prepared dossiers. Ideal for first-in-human medical device studies where sponsors need real clinical data fast to support an FDA IDE or CE MDR submission.

    Sequencing strategy: which country first?

    For medical device sponsors targeting an FDA IDE or CE MDR submission, the pragmatic sequence is: Panama first (fastest FIH data), then Colombia and Mexico in parallel for scale, then Argentina and Brazil for pivotal-phase enrollment. This staggered approach compresses total time-to-evidence by 8–14 months versus a single-country pivot.

    How bioaccess® supports multi-country LATAM submissions

    bioaccess® is a LATAM-focused CRO with in-country regulatory teams across Colombia, Mexico, Panama, Argentina, and Brazil. We prepare harmonized dossiers, manage in-country legal representation, coordinate ethics submissions, and handle import logistics — so sponsors run one program, not five. Talk to our regulatory team to scope your LATAM strategy.

  • INVIMA Clinical Trial Submission Requirements: A 2026 Practitioner’s Guide

    INVIMA — Colombia’s Instituto Nacional de Vigilancia de Medicamentos y Alimentos — is the gate every sponsor running a first-in-human or pivotal study in Colombia has to walk through. Get the dossier right and you’re on-site in ~90 business days. Get it wrong and you’re re-filing at day 120 with a fresh evaluation clock.

    This guide is the exact checklist bioaccess® uses internally, updated for the 2024 medical-device framework revisions and the 2026 UVT fee schedule.

    What INVIMA is and what it regulates

    INVIMA is Colombia’s national health authority for medicines, medical devices, biologics, and food. Clinical trial authority sits primarily under three legal instruments:

    • Resolución 2378/2008 — the Good Clinical Practice framework and core CTA requirements.
    • Decreto 677/1995 — the drug regulatory foundation, still governing pharmaceutical CTAs.
    • Decreto 4725/2005 + 2024 medical-device framework revisions — the device pathway, including the risk classification matrix.

    Submission pathway by product class

    The dossier depth, evaluation timeline, and CEI review depth all scale with product class:

    ProductPathwayTypical INVIMA timeline
    Class I / IIa devicesStreamlined CTA60–85 business days
    Class IIb / III devicesFull CTA + expert panel review90–120 business days
    Drugs (small molecule)CTA under Decreto 67790–110 business days
    Biologics / ATMPsCTA + INVIMA biologics unit110–150 business days
    Combination productsDual-track (drug + device)120–160 business days

    The dossier: 14 required modules

    1. Cover letter and INVIMA form signed by the sponsor’s Colombian legal representative.
    2. Protocol (English + Spanish executive summary, minimum).
    3. Investigator’s Brochure dated within the last 12 months.
    4. IMPD or device-equivalent technical dossier — for devices, this is the ISO 14155 + ISO 13485 evidence package.
    5. GMP certificate for the manufacturing site (CE, FDA, ANVISA, or PIC/S accepted).
    6. Sponsor legal representative appointment — must be a Colombian entity or resident.
    7. Clinical trial insurance certificate — mandatory local policy, minimum coverage per Resolución 2378.
    8. Informed consent form in Spanish (and any Indigenous-language variants required by the study population).
    9. Investigator CVs + Colombian medical licenses for every named PI and sub-investigator.
    10. Study budget and financial disclosure per Colombian requirements.
    11. Contracts — CTA with sites, service agreements with the CRO, laboratory agreements.
    12. Certified Spanish translations of all patient-facing materials.
    13. Apostilled documents for foreign-origin certificates (GMP, incorporation, etc.).
    14. CEI approval or filing evidence — filing in parallel is expected; final approval before FPI.

    Timelines: what actually happens between filing and site activation

    • Pre-submission meeting (optional but recommended): 15–25 days to schedule, resolves classification and pathway questions.
    • Formal filing: Case number issued within 5 business days.
    • Evaluation: 70–100 business days for devices, 90–110 for drugs (median).
    • Auto de requerimientos (deficiency letter, if any): 20 business days to respond, resets a partial clock.
    • Conditional approval: Sites can begin activation (contracts, staff training, EDC build).
    • Final approval: Enrollment permitted after CEI approval is on file.

    Fees: the 2026 UVT-based schedule

    INVIMA fees are indexed to the Unidad de Valor Tributario (UVT), which is revised annually. For 2026, a device CTA evaluation runs approximately 45–95 UVT depending on class, and a drug CTA runs 60–130 UVT. Amendment fees are 15–35 UVT each. Payments are made via PSE or bank transfer against the case number; INVIMA will not open evaluation until the fee is confirmed.

    Ethics Committee (CEI) parallel review

    The single highest-leverage optimization in INVIMA submissions is running CEI review in parallel, not sequentially. INVIMA does not require CEI approval to open evaluation — it only requires it before final authorization to enroll.

    Practical model: file the INVIMA dossier and the CEI dossier the same week. CEI review typically closes in 30–45 days first pass, well inside INVIMA’s 70–100 day evaluation window. By the time INVIMA issues final approval, CEI approval is already on file and site activation can begin immediately.

    Top 8 reasons INVIMA rejects or issues auto de requerimientos

    1. Missing or expired GMP certificate for the investigational product manufacturing site.
    2. Sponsor legal representative not properly constituted under Colombian law (must have local address and registered NIT).
    3. Insurance policy from a non-Colombian carrier without local endorsement.
    4. Protocol version mismatch between the dossier, the ICF, and the CEI submission.
    5. Investigator CVs missing Colombian medical license numbers or with expired credentials.
    6. Untranslated or machine-translated Spanish documents — CEIs and INVIMA both flag this.
    7. Risk classification errors — sponsors defaulting to Class IIa when the device is IIb.
    8. Incomplete preclinical package — missing biocompatibility (ISO 10993), sterilization validation, or shelf-life data.

    Post-approval obligations

    • Amendments: Substantial amendments filed as separate cases; typical review 30–60 business days.
    • SAE reporting: Within 15 calendar days for non-fatal, 7 days for fatal or life-threatening.
    • Annual reports: Study status, enrollment, safety summary, and CEI continuing-review evidence.
    • Close-out: Final report + database lock evidence + CEI close-out within 12 months of last patient last visit.

    How bioaccess® manages INVIMA submissions end-to-end

    bioaccess® has managed 40+ INVIMA CTAs across MedTech, Biopharma, and Radiopharma programs over the last five years. Median approval time on the last twelve submissions: 74 business days. Zero rejections at first review over the same window; three received auto de requerimientos and were re-approved inside 20 days.

    The operating model: dossier assembly with a Colombia-based regulatory lead, parallel CEI filing at day 0–7, insurance and legal-rep binding pre-filing, and a named PM accountable end-to-end. Global Trial Accelerators™ lets sponsors run INVIMA in parallel with ANMAT, ANVISA, COFEPRIS, and MINSA Panama filings under a single accountable operating team.

    For a scoped INVIMA feasibility call, contact bioaccess®.

    Related reading

  • ANMAT Clinical Trial Requirements in Argentina: A 2026 Regulatory Pathway

    ANMAT — the Administración Nacional de Medicamentos, Alimentos y Tecnología Médica — is Argentina’s federal health authority and the first gate for any clinical trial in the country. Its clinical trial pathway is well-defined but layered with provincial requirements that catch sponsors who plan only for the federal filing. This guide is the exact operating map bioaccess® uses on ANMAT submissions in 2026.

    ANMAT’s legal basis

    • Disposición 6677/2010 — the core Good Clinical Practice framework for drug trials.
    • Ley 26.529 (Patient Rights Act) — governs informed consent, patient rights, and confidentiality.
    • Disposición 4457/2006 and its 2019 update — the medical device clinical investigation pathway.
    • Disposición 969/1997 and successor updates — GMP and manufacturing evidence requirements.

    Product-class matrix

    ProductPathwayTypical ANMAT timeline
    Drug studies (small molecule)Disposición 6677 CTA70–95 business days
    Medical devices (Class I–IV)Disposición 4457 investigation authorization80–110 business days
    Biologics / biosimilarsANMAT biologics unit + CTA100–140 business days
    Advanced therapies (ATMPs)Dedicated ATMP pathway (post-2023)140–180 business days

    The federal + provincial dual-track

    ANMAT approval is federal, but Argentina’s constitution reserves health regulation to the provinces. In practice this means every site outside CABA (Ciudad Autónoma de Buenos Aires) requires provincial authorization on top of ANMAT. The three provinces sponsors run into most often:

    • Buenos Aires Province — Ministerio de Salud Provincial, adds 30–60 days.
    • Córdoba — COEIS (Comité de Ética en Investigaciones en Salud) provincial + ministerial track, adds 40–70 days.
    • Mendoza — Departamento de Bioética provincial oversight, adds 30–50 days.

    Filing federal (ANMAT) and provincial dossiers in parallel is the only way to compress this. Filing them sequentially adds 2–3 months to time-to-FPI.

    Dossier requirements

    1. Protocol in Spanish (executive summary + full technical document).
    2. Investigator’s Brochure, current version dated within 12 months.
    3. IMPD or device technical file (ISO 14155 + ISO 13485 for devices).
    4. GMP certificate for the manufacturing site (PIC/S, FDA, EMA, ANVISA accepted).
    5. Sponsor local legal representation — mandatory Argentine entity or resident-appointed representative.
    6. Local clinical trial insurance — must be issued by an Argentine-authorized carrier; foreign policies not accepted without local endorsement.
    7. Informed consent form in Spanish, tailored to each site’s local ethics committee.
    8. PI credentials — Matrícula Nacional or provincial medical registration, GCP training evidence.
    9. CEI (Comité de Ética en Investigación) registration certificates for each site’s ethics committee.
    10. Budget disclosure and financial arrangements.
    11. Contracts — CTA with sites, service agreements with CRO.

    CEI registration and parallel review

    Every CEI in Argentina must be registered with ANMAT and, where applicable, with the provincial health ministry. Not every hospital committee is ANMAT-registered — verify before selecting a site. Independent (non-institutional) CEIs are permitted but face higher scrutiny.

    CEI review typically runs 30–50 days for the first pass and 15–25 days for a re-review. Filing CEI review in parallel with ANMAT is standard practice — the federal authority does not require CEI approval to open evaluation, only to authorize enrollment.

    Realistic timeline

    • Weeks 1–3: Dossier assembly, translations, legal rep and insurance binding.
    • Week 3–4: Parallel filing — ANMAT federal + provincial + CEI.
    • Weeks 5–16: ANMAT evaluation and provincial review; CEI first-pass review closes in this window.
    • Weeks 14–18: Approvals received; import permits filed (ANMAT + Aduana).
    • Weeks 18–22: Import cleared, SIV, first-patient enrollment.

    Median: 5–5.5 months signed CTA → FPI for a Buenos Aires-only study; add 1–2 months for multi-province studies.

    Import permits for IMP and IMD

    Investigational product import is a two-step process: ANMAT issues the import authorization tied to the approved CTA, then Aduana (customs) processes the physical entry. Total import cycle: 15–30 days. Common failure mode: expired ANMAT authorization at Aduana — the ANMAT permit typically has a 90-day validity window, and Aduana will reject anything expired.

    SAE and periodic safety reporting

    • Fatal or life-threatening SAEs: 7 calendar days to ANMAT.
    • Non-fatal serious SAEs: 15 calendar days.
    • DSUR (Development Safety Update Report): Annual, aligned with international harmonization.
    • Line listings: Provided at ANMAT request, typically quarterly for high-risk studies.

    How bioaccess® executes ANMAT studies

    bioaccess®’s Argentina operating model runs on a Buenos Aires + Rosario site network with two provincial dossiers filed in parallel. Median time to FPI on our last six ANMAT-authorized studies: 5.1 months. Global Trial Accelerators™ coordinates ANMAT filings alongside INVIMA (Colombia), ANVISA (Brazil), COFEPRIS (Mexico), and MINSA (Panama) under one accountable operating team.

    For a scoped ANMAT feasibility call, contact bioaccess®.

    Related reading

  • Clinical Trial Approval Times in Latin America, the US and Canada: Legal Clocks vs Real-World Data (2026)

    By Julio G. Martinez-Clark

    CEO, bioaccess®

    General information, not legal or regulatory advice. Legal deadlines are cited to the regulation or the regulator’s own page. Figures marked “bioaccess® experience” come from the study timelines (Gantt charts) we have prepared for sponsors; they are planning estimates, not legal deadlines or guaranteed turnarounds. Rules change, so confirm the current clock with the regulator before you commit a date.

    In this guide: The short answer · How to read a review clock · Clocks at a glance · Country table · Legal vs observed · Drugs vs devices · Planning checklist · Glossary · FAQ · Sources

    The short answer

    Most regulators in the Americas publish a review clock for clinical trials. For the main drug and device authorization routes in 2026, the published clocks run from 30 calendar days (United States, Canada, Mexico) to 90 business days, about 4 months (Brazil, drug trials). Some steps have shorter clocks, such as acknowledgments, registrations and fast-track targets. Uruguay’s health ministry publishes no regulator clock in the sources we checked.

    A legal clock is not your approval date. Five things decide how long the review really takes:

    1. When the clock starts. Most clocks start only when the file is accepted as complete.
    2. Whether it stops. In most countries the clock stops while you answer the regulator’s questions.
    3. What silence means. In the United States, Canada (drug trials) and Brazil, a trial can start if the regulator does not object within its clock. In Mexico, silence means the application is denied.
    4. The order of reviews. In Mexico, Colombia, Peru, Chile, Costa Rica, Ecuador and Guatemala the regulator reviews after the ethics committee approves. In Argentina, ANMAT authorizes the study and each site follows with its committee’s approval. In Brazil, and in Panama for high-risk research, the two reviews can run at the same time. In El Salvador one submission goes to both through a shared platform, and the regulator’s authorization requires the ethics approval.
    5. Business days or calendar days. 30 business days is about 6 weeks; 90 business days is about 4 months, before public holidays.

    Real-world data can sit on either side of the clock. Mexico’s regulator, COFEPRIS, reported an average of 45 days to approve protocols in January–April 2025, against the 90-day legal term then in force; the 30-calendar-day maximum came in with the April 2025 agreement. Brazil’s regulator, ANVISA, reported that 23% of the trial petitions it closed in 2025 were released because its 90-business-day clock ran out.

    This guide applies to drug and device trials. Where the rule differs for devices, the table says so. For the full path from protocol to first patient, see our site activation timeline guide.

    How to read a review clock

    The steps are industry standard across the Americas: the sponsor files, the regulator checks the file is complete, the technical review runs, the regulator asks questions or decides, and the sponsor answers. Each country sets its own rules for five points.

    Question to ask Why it matters Example
    Business or calendar days? 60 business days is about 3 months; 60 calendar days is 2. Colombia’s INVIMA counts business days; Mexico’s 2025 maximum is in calendar days.
    What starts the clock? A completeness check can come first. Guatemala validates the file within 5 calendar days; its 30-business-day clock runs from complete documentation.
    Does the clock stop for questions? Your answer time is usually not counted. Panama’s ethics committees do not count the time spent answering them. Brazil’s single technical requirement suspends ANVISA’s clock.
    What happens if the regulator is silent? Decides whether a late review blocks you. Brazil: start with ethics approval. Mexico: deemed denied. Peru: the sponsor can appeal.
    Ethics first, or at the same time? Sequential reviews add the ethics time to the regulator’s clock. Mexico’s committees approve before COFEPRIS reviews; in Panama, MINSA’s review of high-risk research runs alongside the ethics review.

    Clocks at a glance

    Published regulator review clocks vs observed timesBar chart of each regulator’s published first-decision clock in approximate calendar days, with dots for published observed averages and bioaccess experience.0d30d60d90d120d150d180dUnited States · FDA (IND/IDE)30Canada · Health Canada (CTA)30Mexico · COFEPRIS30Panama · pharmacy directorate21Costa Rica · CONIS21El Salvador · SRS (UEC)28Peru · INS42Chile · ISP (drugs)45Guatemala · DRCPFA47Argentina · ANMAT (drugs)63Dominican Rep. · CONABIOS63Ecuador · ARCSA67Colombia · INVIMA (drugs)84Brazil · ANVISA (devices)90Brazil · ANVISA (drugs)126Published clock, approx. calendar daysPublished observed averagebioaccess® experienceBusiness days × 7/5. Observed: Mexico Jan–Apr 2025 (before the 30-day rule); Chile ISP average; Argentina 2021 (before the 2025 rule); Brazil 2025 full review.bioaccess® experience: Panama MINSA review; El Salvador total approval without questions.
    Published regulator clocks vs observed times (sources in the table below)

    The bars show each regulator’s published clock for a first decision, converted to approximate calendar days (business days × 7/5, before holidays). The dots show published real-world averages and, separately, bioaccess® experience. Ethics review time is not included unless the label says so. Uruguay’s health ministry publishes no regulator clock, so it has no bar.

    Regulator review clocks by country

    Country Regulator Published clock Clock stops and silence Ethics order Drugs and devices Official source
    Argentina ANMAT Clinical pharmacology (drug) studies for registration purposes: 20 business days technical review + 10 administrative for low-risk and special studies; 35 + 10 for the rest. Completeness is checked within 2 business days. Phase 1, advanced-therapy, innovative and locally developed products need a pre-submission meeting, requested at least 60 business days before filing. ANMAT stops the clock when it raises objections; the sponsor has 15 business days to answer, or the application can be denied. No silence rule found. ANMAT authorizes the study; each site is then authorized by, or notified to, ANMAT with the approval of its accredited ethics committee. The 2025 rule covers clinical pharmacology studies. Device trials follow a separate ANMAT procedure: confirm the clock. Disposition 7516/2025
    Brazil ANVISA Drugs: 90 business days for the clinical drug development dossier. Prioritized drug petitions: 60 calendar days in total since January 2026 (15 days to confirm priority, then 45, under RDC 1.001/2025); rare-disease trials: 30 calendar days once ANVISA confirms the priority (RDC 205/2017). Devices (class III–IV not registered in Brazil, or a new indication): 90 calendar days. Drug trials (RDC 945): one technical requirement suspends the clock, and the sponsor has 30 business days to answer. Drugs and devices: if ANVISA does not answer in time, the trial can start once the ethics approval is in. Can be filed at the same time as ethics; the trial starts only after both approve. Class I–II device studies, and registered devices studied for their approved indication, do not file a device dossier with ANVISA. Law 14,874/2024; RDC 837/2023
    Chile ISP Drug trials: a 45-day term for evaluation and authorization, as InvestChile reported it in 2022; ISP’s reported average evaluation was 28 business days. The center director then authorizes the study. Ethics committee: 45 days for its report, extendable once by 20 days. The accredited ethics committee reports first; the file then goes to ISP. bioaccess® experience (device study): a notification to the health authority after ethics approval, acknowledged in about 16 days. Supreme Decree 114/2010; Resolution 5161; InvestChile
    Colombia INVIMA Drug trials: first response within 60 business days. The sponsor has 30 days to answer or request an extension; INVIMA decides within 30 days of the answer. No silence rule found. Ethics committee first. Device trials go to INVIMA’s specialized devices chamber. We found no published device clock. INVIMA guide ASS-RSA-GU039; device trials page
    Costa Rica CONIS (national research council) Acknowledgment of a complete registration within 5 business days, which registers the protocol provisionally; technical report within 10 business days of assignment. A single notice to complete the file, with 10 business days to respond. Accredited ethics committee (CEC) first; the CEC files with CONIS. Applies to biomedical research generally. At social security (CCSS) hospitals, research can start 8 days after the investigator is notified of the CONIS registration and receives the ethics approval documents (CCSS instruction). CONIS procedure 2025
    Dominican Republic CONABIOS (national bioethics council) Final result within 45 business days; 21 calendar days for urgent protocols. Submit at least 60 days before the planned start. No silence rule found. The site’s ethics committee (or a recognized independent one) approves first; CONABIOS then gives the national ethics review. Confirm whether a separate regulator review applies to your study. Applies to research protocols generally. CONABIOS manual, 2nd ed.; legal basis, incl. Provision 004-A-2004
    Ecuador ARCSA As published by ARCSA (day type not stated): document check in 7 days; technical review up to 60 days, extendable by 30. Document observations: 30 days to correct, extendable by 30. Technical observations: 90 days to answer, extendable by 90. No silence rule found. The ethics committee (CEISH) approves first; its approval is part of the ARCSA file. Device trials follow the drug procedure until device rules are issued. A sponsor without a seat in Ecuador designates a contract research organization registered with ARCSA. ARCSA clinical trial authorization
    El Salvador SRS clinical trials unit (UEC) The SRS published route (2025): research site registration 20 business days; ethics approval by the national committee (CNEIS) 20 business days; trial authorization by the UEC 20 business days; special import permit 24 to 72 business hours; product check at the site 14 business days. No silence rule found. One shared SRS–CNEIS platform receives the ethics and the technical files. The SRS route lists CNEIS approval before the UEC authorization, and the authorization file includes the ethics approval. The SRS guide covers drugs and devices. bioaccess® experience (study timelines): approval in about 47 days without questions; 67 to 85 days with one round. SRS evaluation route; SRS authorization guide, 2025
    Guatemala DRCPFA (Ministry of Health) File validated within 5 calendar days; authorization within 30 business days of complete documentation. The sponsor has 15 business days to answer; final decision within 15 business days of the answer. A favorable report from an authorized ethics committee is part of the file. Covers drugs and devices. Ministerial Agreement 206-2021
    Mexico COFEPRIS Maximum 30 calendar days for protocol authorization, including the reliance route, under the April 2025 agreement. COFEPRIS issues one prevention notice, answered in a single upload within the deadline it sets. If COFEPRIS does not respond, the application is deemed denied (ClinRegs). The ethics committee’s approval is part of the application, so the committees approve first. One procedure (COFEPRIS-04-010) covers drugs and devices (‘new resources’). Since May 2026, research without risk no longer needs COFEPRIS authorization. The approved consent and the insurance policy can be filed with the application or within 15 business days after authorization. DOF, 28 April 2025; DOF, 4 May 2026; ClinRegs Mexico
    Panama MINSA and the pharmacy directorate (DNFD) Registry receipt within 3 business days. Where medicines or health products are used, the DNFD responds within 15 business days. Ethics review up to 20 business days (10 expedited), 30 in total if it goes to the full committee. Ethics review: the time spent answering the committee is not counted. MINSA’s technical review of high-risk research has no published clock, and its result must be answered before the committee’s final decision. For high-risk research, MINSA’s technical review runs alongside the ethics review. Medicines and other health products. Executive Decree 21/2026
    Peru INS Maximum 30 working days, including the 30-day opinion of the medicines authority (DIGEMID). If INS misses the deadline, the sponsor can file an appeal within 15 business days. The INS-accredited ethics committee approves first. Confirm the scope for device studies with INS. Supreme Decree 021-2017-SA (MINSA); ClinRegs Peru, also citing Supreme Decree 010-2025-SA
    Uruguay MSP (Ministry of Public Health) No MSP clock found. National ethics commission (CNEI): 60 days, extendable, for trials with new drugs, indications, vaccines, diagnostics, devices or invasive procedures. The CNEI clock runs from complete documentation. Investigators have 60 days to answer committee questions, or the file is archived. The institutional ethics committee (60 days) and, where required, the CNEI review before MSP registration and authorization. Drugs and devices both go to the CNEI. Decree 158/019
    United States FDA Drugs: an IND goes into effect 30 days after FDA receives it. Devices (significant risk): an IDE study can begin 30 days after receipt. If FDA does not place a clinical hold (IND) or object (IDE) within 30 days, the study can begin with IRB approval. IRB review can run at the same time; no federal IRB clock. Non-significant-risk device studies need no IDE application to FDA; IRB approval and the abbreviated IDE requirements apply. 21 CFR 312.40; 21 CFR 812.30; 21 CFR 812.2
    Canada Health Canada Drugs: 30-day default for a clinical trial application (CTA); 7-day administrative target for phase I trials in healthy adults and comparative bioavailability studies. Devices (class II–IV): 30-day review target for an investigational testing authorization (ITA). CTA: the trial can proceed after 30 days without an objection. ITA: a target, not a default; a request for information gives 60 days to respond, then a new 30-day review. Research ethics board (REB) approval is required for each site; it can run at the same time. The 7-day target excludes cell and gene therapies, xenografts, prophylactic vaccines and reproductive technologies. CTA guidance; ITA guidance

    Colombia note. INVIMA reviews after the ethics committee approves, so plan the committee calendar first. bioaccess® runs first-in-human studies in Colombia now.

    What the clock does not include. Import permits, insurance, contracts and translation run outside the regulator’s clock. Mexico’s import permit for investigational drugs has its own 10-day clock, and approval is deemed granted if COFEPRIS does not answer (ClinRegs). See what slows site activation and our insurance requirements by country.

    Ethics committee clocks are covered country by country in our ethics committee submission requirements guide.

    Published data on real review times is scarce. Here is what we found, with each source’s scope. Most figures measure the regulator only, not ethics or the whole start-up.

    Country Observed time Scope Source
    Brazil Petitions filed under Law 14,874 and closed in 2025, mean total time to completion: prioritized, 72 to 78 days (reliance route) and 119 to 187 days (full review); non-prioritized, 126 days (reliance), 157 days (full review) and 136 days (released when the clock ran out). ANVISA drug trial petitions; completion includes approvals, refusals and withdrawals; total = queue + analysis + sponsor time ANVISA COPEC annual report 2025
    Brazil 23% (93) of trial petitions closed in 2025 were released because the 90-business-day clock ran out. ANVISA drug trial petitions ANVISA COPEC annual report 2025
    Brazil Only 12.5% of trials enrolled their first participant within 60 days of ANVISA authorization; 31% took more than 180 days. 264 trials started ANVISA COPEC annual report 2025
    Brazil Mean final approval fell from 341 days (2013) to 90 days (2023) at ANVISA, and from 164 to 141 days at the national ethics commission (CONEP). 196 oncology trials managed by contract research organizations, before Law 14,874 Giacomazzi et al., JCO Global Oncology, 2026
    Mexico Average 45 days in January–April 2025 (50 calendar days in the first quarter), down from 90 in 2024; amendments 57 days. COFEPRIS protocol approvals, before the 30-day maximum took effect COFEPRIS press release 16/2025
    Argentina Average approval about 80 days, down from 140 in 2018. ANMAT, as reported by the pharmaceutical chamber CAEME, before Disposition 7516/2025 Economis, 2022
    Chile Average evaluation 28 business days for authorization to import, manufacture or use an investigational drug. ISP drug trial authorizations, as reported by InvestChile (2022) InvestChile
    Panama Registry number about 5 days after filing; MINSA review about 26 days; first ethics response about 28 days. bioaccess® experience, from our study timelines bioaccess® study timelines
    El Salvador First responses in about 3.5 to 7 weeks; approval in about 47 days without questions, 67 to 85 days with one round. bioaccess® experience, from our study timelines; regulator and ethics together bioaccess® study timelines
    Colombia Each site’s ethics approval in about 4 to 5 weeks, then INVIMA. bioaccess® experience, from our study timelines (device study) bioaccess® study timelines

    What the data shows. Review times have shortened across the region. Mexico, Brazil and Argentina all report real times well below where they were a few years ago. But a legal clock does not guarantee your authorization date or your first patient: in Brazil, almost a quarter of petitions ran past the 90-business-day clock in 2025, and the time from authorization to first participant was often longer than the review itself.

    For context only: a 2026 review reported median trial start-up times of about 2.8 months in Mexico, 4.5 months in Argentina, 4 to 7 months in Brazil, 4.6 months in Chile, 7 months in Colombia and up to 9 months in Peru (Zavaleta-Monestel et al., Cureus, 2026). Start-up definitions differ between studies, so these are not comparable with the review clocks above.

    Drugs vs devices

    The steps are the same for drugs and devices: ethics review, regulator review where it applies, then import and site activation. The differences are in scope and clocks:

    • Some device studies skip the regulator. In the United States, non-significant-risk device studies need IRB approval only. In Brazil, only class III–IV devices not registered in Brazil (or used for a new indication) file a device dossier with ANVISA.
    • Device clocks can differ. Brazil’s device clock is 90 calendar days, shorter than the 90 business days for drugs. Canada’s device review (ITA) has a 30-day target, not a default approval.
    • Some rules are drug-only. Argentina’s 2025 disposition, Colombia’s GU039 clock and Chile’s ISP authorization are written for drug trials. Ask the regulator which procedure and clock apply to your device.
    • Same procedure in some countries. Mexico, Ecuador, Guatemala and El Salvador use one procedure for drugs and devices.
    • Brazil’s drug-only clock stop. The single technical requirement and 30-business-day answer period are set for drug dossiers; ask ANVISA how questions are handled for a device dossier.

    Planning checklist: before you trust a review date

    • ☐ Confirm whether the clock is in business or calendar days, and list the public holidays in the window.
    • ☐ Find what starts the clock: filing, acceptance as complete, or payment of the fee.
    • ☐ Check whether ethics approval must come first. If so, add the committee’s time and meeting calendar.
    • ☐ Plan at least one round of questions and your answer time, which is usually not counted.
    • ☐ Read the silence rule. Know whether a late answer lets you start, blocks you or lets you appeal.
    • ☐ For devices, confirm the class and whether the study needs regulator review at all.
    • ☐ Check post-approval filings, such as Mexico’s consent and insurance filing within 15 business days.
    • ☐ Plan the import permit, insurance and contracts in parallel; they are outside the clock.
    • ☐ Compare the legal clock with published observed data before you set a date.
    • ☐ Re-check the rules: Panama (2026), Argentina (2025), Mexico (2025) and Brazil (2024) changed their procedures recently.

    Glossary

    • Business day (día hábil). A working day, excluding weekends and public holidays.
    • Clock stop. A pause in the review clock while the sponsor answers questions.
    • Silence rule. What happens if the regulator does not answer within its clock: the trial can start, the application is denied, or the sponsor can appeal.
    • CTA / IND. Clinical trial application (Canada) and investigational new drug application (United States).
    • ITA / IDE. Investigational testing authorization (Canada) and investigational device exemption (United States), the device equivalents.
    • Reliance route. A shorter review that relies on an approval by a reference regulator.
    • Ethics committee (CEI, CEP, CIEI, CEC, CEISH, IRB, REB). The local names for the committee that reviews a study’s ethics and consent.
    • DDCM. Brazil’s clinical drug development dossier filed with ANVISA.

    Frequently asked questions

    How long does clinical trial approval take in Latin America?
    Published regulator clocks for a first decision run from 30 calendar days in Mexico to 90 business days, about 4 months, for drug trials in Brazil. Add the ethics review where it must come first, and the time to answer questions. Published averages were 45 days at COFEPRIS (Mexico) in early 2025, and about 2.4 to 6 months to complete ANVISA petitions (Brazil) in 2025, depending on the route.

    Which country in Latin America has the fastest regulatory approval?
    Compare like with like: the whole path to permission to start, not one step. On that basis, Panama’s published clocks are short (DNFD 15 business days; ethics up to 20 business days, 30 if the study returns to the full committee), and Mexico’s regulator has 30 calendar days after the committees approve. In our study timelines, Panama and El Salvador approved complete submissions in about 1 to 3 months, ethics included. The fastest country for your study also depends on where your patients are.

    Can ethics and regulatory reviews run at the same time?
    In Brazil, and in Panama for high-risk research, yes. El Salvador takes one submission for both through a shared platform, and the authorization requires the ethics approval. In Mexico, Colombia, Peru, Chile, Costa Rica, Ecuador and Guatemala, the ethics committee approves first. In the United States and Canada, IRB or REB review can run alongside FDA or Health Canada review.

    What happens if the regulator does not answer in time?
    It depends on the country. In the United States, Canada (drug trials) and Brazil, the trial can start once ethics approval is in. In Mexico, the application is deemed denied. In Peru, the sponsor can file an appeal within 15 business days. Most other countries publish no silence rule.

    How long does COFEPRIS take to approve a clinical trial?
    Since the April 2025 agreement, COFEPRIS has a maximum of 30 calendar days for protocol authorization, after the ethics committee approves. Before that agreement the legal term was 90 days, and COFEPRIS reported an average of 45 days in January–April 2025.

    How long does ANVISA take to approve a clinical trial?
    ANVISA has 90 business days for standard drug trial dossiers, 60 calendar days in total for prioritized petitions since January 2026, 30 calendar days for confirmed rare-disease trials, and 90 calendar days for dossiers on class III–IV devices not registered in Brazil (or a new indication). If it misses the deadline, the trial can start with ethics approval; 23% of petitions closed in 2025 were released this way.

    How long does INVIMA take to approve a clinical trial?
    For drug trials, INVIMA gives its first response within 60 business days, after ethics approval. The sponsor has 30 days to answer and INVIMA decides within 30 days. We found no published clock for device trials.

    Do device trials have the same approval times as drug trials?
    Not always. Brazil’s device clock is 90 calendar days, and non-significant-risk device studies in the United States need no IDE application to FDA. Argentina’s, Colombia’s and Chile’s published clocks are for drug trials. Mexico, Ecuador, Guatemala and El Salvador use one procedure for both.

    Is the regulator’s approval enough to start the trial?
    No. You also need ethics approval, a signed site contract, insurance, the product on site and a trained team. In Brazil, only 12.5% of trials enrolled their first participant within 60 days of ANVISA authorization.

    Plan your approval timeline

    bioaccess® prepares country-by-country approval timelines for drug and device sponsors, using the published clocks and our own study timelines. bioaccess® runs first-in-human studies in Colombia now. Contact us to get a timeline for your study.

    Related reading: Site activation timeline in Latin America · Ethics committee submission requirements by country · Clinical trial insurance requirements by country · Ethics committees: parallel vs sequential submissions · Panama CNBI procedure checklist · IRB (CEI) approval for a device study in Colombia

    Sources

    • Argentina: ANMAT Disposition 7516/2025 (InfoLEG).
    • Brazil: Law 14,874/2024 (Planalto); ANVISA RDC 945/2024 and RDC 837/2023; ANVISA COPEC annual activity report 2025; Giacomazzi et al., JCO Global Oncology, 2026.
    • Chile: Supreme Decree 114/2010 and ISP Exempt Resolution 5161 (Ley Chile); InvestChile pharmaceutical industry e-book.
    • Colombia: INVIMA guide ASS-RSA-GU039; INVIMA medical device clinical investigation page.
    • Costa Rica: CONIS procedure CONIS.01.09 (2025); CCSS memo CENDEISSS-AB-0115-2024.
    • Dominican Republic: CONABIOS operating manual, 2nd edition; Provision 004-A-2004.
    • Ecuador: ARCSA clinical trial authorization page.
    • El Salvador: SRS clinical trial evaluation route (2025), authorization guide v01 (2025) and SRS–CNEIS platform instructions (2025).
    • Guatemala: MSPAS Ministerial Agreement 206-2021, clinical trial regulation.
    • Mexico: Agreements published in the DOF on 28 April 2025 and 4 May 2026; ClinRegs Mexico (NIH); COFEPRIS press release 16/2025 (22 May 2025).
    • Panama: Executive Decree 21 of 2026 (Gaceta Oficial 30510-C).
    • Peru: Supreme Decree 021-2017-SA (MINSA); ClinRegs Peru (NIH), citing Supreme Decrees 021-2017-SA and 010-2025-SA.
    • Uruguay: Decree 158/019 (IMPO).
    • United States: 21 CFR 312.40, 812.2 and 812.30 (eCFR).
    • Canada: Health Canada CTA and ITA guidance documents.
    • Argentina, observed: CAEME, as reported by Economis (2022).
    • Region: Zavaleta-Monestel et al., Cureus, 2026.
    • bioaccess® study timelines (Gantt charts) for drug and device studies in Panama, El Salvador, Chile and Colombia, 2022 to 2026, de-identified.


  • How to Run a First-in-Human Medical Device Trial in Colombia (2026 Playbook)

    Colombia is now the fastest, most predictable jurisdiction in Latin America for first-in-human (FIH) and early feasibility medical device studies. Under INVIMA Resolution 2378/2008 (GCP) and Decree 582/2017, sponsors can move from final protocol to first-patient-in (FPI) in 4–6 months when CEI and INVIMA reviews run in parallel and site contracting is executed alongside the regulatory dossier. This playbook lays out the operating model bioaccess® uses to deliver that timeline.

    Why Colombia for first-in-human

    • Regulatory clock: INVIMA median review 90–120 days for Class IIb/III device studies.
    • Ethics workflow: 7 accredited CEIs bioaccess® routinely works with; 32-day median first-review turnaround; 89% first-review approval rate over 24 months.
    • Patient access: Concentrated tertiary centers in Bogotá, Medellín, Barranquilla, and Bucaramanga with treatment-naïve populations.
    • Cost: 40–55% below US per-patient benchmarks for comparable Class III device studies.
    • Data acceptance: ICH-GCP data accepted by FDA, EMA, and Health Canada when GCP compliance and monitoring standards are documented.

    The 4–6 month FIH Colombia timeline

    PhaseWeeksKey deliverables
    Feasibility & site selection0–4PI shortlist, site qualification, CEI mapping, budget model
    Dossier assembly2–8Protocol, IB, IFU, risk analysis, insurance, IMDRF-aligned technical file
    Parallel CEI + INVIMA filing8–10CEI dossier and INVIMA submission filed same week
    Reviews & stipulation responses10–22CEI (32-day median), INVIMA (90–120 days), site contract execution in parallel
    Import permit + site activation20–24INVIMA import permit, device shipment, SIV, IP release
    First patient in24–26FPI achieved 4–6 months post-kickoff

    The FIH Colombia dossier

    • Clinical protocol (Spanish + English) with FIH-specific stopping rules and DSMB charter.
    • Investigator’s Brochure with complete preclinical package (biocompatibility, sterilization, animal data).
    • Risk management file (ISO 14971) and IMDRF-aligned technical documentation.
    • Instructions for Use (IFU) and training plan for investigators.
    • Clinical trial insurance covering all Colombian subjects.
    • Investigator CVs, GCP certificates, financial disclosures.
    • CEI-specific informed consent (Colombian regulatory language).
    • Site-level budgets and contracts.

    Site network and PI selection

    For FIH device studies, bioaccess® typically activates 1–3 tertiary-care sites in Bogotá and Medellín. Site selection weighs PI publication history, device-trial experience, ICU/imaging infrastructure, and CEI relationship. bioaccess® has active submission relationships with 7 accredited CEIs and executes site contracts in parallel with CEI/INVIMA review so activation is not the critical-path bottleneck.

    Safety reporting and DSMB

    • Fatal/life-threatening SUSARs: 7 calendar days to INVIMA and CEIs.
    • Non-fatal serious SAEs: 15 calendar days.
    • DSUR: Annual, ICH-aligned.
    • Independent DSMB: Recommended for all FIH device studies; bioaccess® operationalizes charter, meeting cadence, and unblinded stats support.

    How bioaccess® runs FIH Colombia programs

    Global Trial Accelerators™ is bioaccess®’s single-accountable operating model for FIH device studies. One project manager, one master timeline, one weekly sponsor readout, and integrated coordination across INVIMA, CEI, sites, insurance, importation, monitoring, and safety. Median time to FPI on the last 12 FIH Colombia studies: 4.6 months.

    For a scoped FIH Colombia feasibility call, contact bioaccess®.

    Related reading

  • What Is an Investigator's Brochure and Why Every FIH Sponsor Needs One Ready

    What Is an Investigator’s Brochure and Why Every FIH Sponsor Needs One Ready

    If you are preparing for a first-in-human trial, the investigator's brochure will be one of the first documents your regulatory reviewers, ethics committees, and clinical sites ask for. Yet many early-stage sponsors treat it as an afterthought — something to pull together in the weeks before submission rather than a document built in parallel with protocol development.

    That approach creates delays. This article explains what an investigator's brochure is, what it must contain, and why having a complete, current version ready before you engage a CRO or submit to a regulatory authority is not just good practice — it is a prerequisite for moving fast.

    What Is an Investigator’s Brochure?

    An investigator's brochure (IB) is a compiled document that summarizes all clinical and non-clinical data relevant to studying an investigational product in human subjects. It gives the principal investigator and site staff what they need to understand the rationale for the trial, the expected risks and benefits, and how to manage participants safely.

    For drug and biologic trials, the IB is required under ICH E6(R2) GCP guidelines. For medical device trials, the analogous document is often the Investigational Device Exemption (IDE) application or the Investigational Plan — but the underlying need is the same. Investigators require a consolidated reference that explains the device, its preclinical performance data, and the scientific basis for proceeding to human use.

    The IB is not a marketing document. It is a scientific summary written for clinicians and regulators.

    What an Investigator’s Brochure Must Contain

    ICH E6(R2) sets out the standard structure. A complete IB typically includes:

    • Title page and table of contents — sponsor name, product name or code, version number, and date
    • Confidentiality statement — restricting use to investigators and ethics committees
    • Summary — a brief synopsis of the physical, chemical, pharmaceutical, and pharmacological properties, and their clinical implications
    • Introduction — the product name, active ingredients, pharmacological class, and rationale for conducting research
    • Physical, chemical, and pharmaceutical properties — relevant to safety and handling, particularly important for radiopharmaceuticals and implantable devices
    • Non-clinical studies — pharmacology, toxicology, pharmacokinetics, and metabolism data from animal or in vitro studies, with a discussion of findings and their relevance to human use
    • Effects in humans — any prior human data, including compassionate use or early feasibility results if available
    • Summary of data and guidance for the investigator — a concise risk-benefit assessment and practical guidance on dosing, monitoring, and adverse event management
    • References — cited literature supporting the above sections

    For medical devices specifically, the non-clinical section should include bench testing results, biocompatibility data, and any animal study outcomes. The summary should address the device's intended use and the basis for the proposed first-in-human use parameters.

    Why the IB Matters More Than Most Sponsors Realize

    It Is the Foundation for Ethics Committee Review

    Before any clinical site in Panama, Chile, El Salvador, or the Dominican Republic can enroll a patient, the local ethics committee and national regulatory authority must review and approve the study. That review is grounded in the IB. Reviewers use it to assess whether the preclinical safety package justifies exposing humans to the investigational product.

    An incomplete or poorly organized IB does not just slow down approval — it can trigger requests for additional data that take months to generate. In jurisdictions where regulatory approvals can move in 30 to 90 days, a weak IB is often the single biggest bottleneck sponsors create for themselves.

    It Sets the Risk Framework for Your Protocol

    The IB and the clinical protocol are co-dependent documents. Stopping rules, dose escalation criteria, adverse event monitoring thresholds, and inclusion/exclusion criteria should all be traceable back to the risk signals identified in the IB.

    If you write the protocol before the IB is complete, you are making safety assumptions without a documented evidentiary basis. Regulators will notice. Ethics committees will ask where those assumptions came from.

    It Protects Investigators and Sponsors

    When an adverse event occurs during a trial, the IB is the reference point for determining whether the event was anticipated. An event that matches a known risk documented in the IB is handled differently from one that was not disclosed. A thorough, honest IB protects investigators by giving them accurate expectations — and it protects sponsors by demonstrating that known risks were disclosed to the site before enrollment began.

    It Must Be Updated Throughout the Trial

    The IB is a living document. ICH E6(R2) requires that it be reviewed at least annually and updated whenever new information materially changes the risk-benefit picture. If new safety signals emerge from parallel studies while your trial is ongoing, the IB must reflect that, and sites and ethics committees must receive updated versions promptly.

    Sponsors who treat the IB as a document written once and filed away will find themselves out of compliance when auditors review the trial master file.

    Common Mistakes FIH Sponsors Make With the IB

    Starting too late. The IB should be drafted in parallel with preclinical work, not after it concludes. If animal studies are still running, draft the structure now and populate it as data becomes available.

    Omitting negative findings. Regulators and ethics committees are not looking for a document that presents only favorable data. Omitting unfavorable preclinical findings does not make them disappear — it raises questions about sponsor credibility and can result in clinical holds.

    Using inconsistent terminology. The product name, dose units, and adverse event terminology in the IB should match the protocol exactly. Discrepancies between documents create confusion during review and can delay approval.

    Failing to localize for the operating jurisdiction. If your trial is running in Latin America, the IB may need to be available in Spanish depending on the country and the ethics committee's requirements. Sponsors who assume an English-only document will suffice in every jurisdiction often discover this requirement at the worst possible moment.

    Not assigning version control. Every IB update must carry a new version number and date. Without it, sites may be working from outdated information without realizing it.

    The IB in the Context of a First-in-Human Program

    For a startup running its first FIH trial, the IB is one of nine workstreams that need to come together before a patient can be enrolled. It sits upstream of protocol development, site selection, ethics committee submission, and regulatory authority review.

    The bioaccess® FIH-12 program is structured around exactly this kind of interdependency. One accountable team manages all nine workstreams — from FDA strategy alignment and protocol development through site activation, patient enrollment, data management, and delivery of a submission-ready clinical evidence package — within a 12-month timeline. That structure only works when foundational documents like the IB are treated as program-critical deliverables, not administrative tasks.

    Sponsors who arrive with a complete, current IB move faster through regulatory review in Panama, El Salvador, Chile, and the Dominican Republic, where approvals run 30 to 90 days under normal conditions. Sponsors who arrive without one add weeks or months to a timeline that was already tight.

    What a Strong IB Looks Like in Practice

    A well-constructed IB for a first-in-human medical device trial typically runs 30 to 80 pages, depending on the volume of preclinical data. It should be organized so that a principal investigator who has never seen the device can read the summary section and come away with a clear understanding of the product, its intended use, the key preclinical findings, and the anticipated risks — in under 20 minutes.

    The non-clinical section should be honest about data gaps. If a particular toxicology study has not been completed, say so and explain why the available data is sufficient to justify proceeding. Regulators are accustomed to early-stage programs with incomplete datasets. What they are not accustomed to is sponsors who do not acknowledge what they do not yet know.

    The guidance section at the end should be practical: what investigators should watch for, how to grade adverse events using a recognized scale, when to contact the sponsor, and when to stop dosing or use. This section is consistently underdeveloped in first-time sponsor IBs.

    Regulatory Alignment Across Jurisdictions

    Running a multi-country FIH trial means the IB must satisfy the requirements of each operating jurisdiction's regulatory authority. In Panama, that means MINSA and CNBI. In Chile, ISP and MINSAL. In El Salvador, SRS and CNEIS. Each authority may have specific formatting or language requirements, and the ethics committee at each site may request additional sections or clarifications.

    Building a single IB that satisfies all applicable requirements from the start is far more efficient than drafting one version and adapting it reactively. Sponsors who have been through this process before know that the time invested in a rigorous initial IB pays back in faster approvals and fewer revision cycles.


    Frequently Asked Questions

    What is an investigator's brochure in clinical trials?
    An investigator's brochure is a document compiled by the sponsor that summarizes all relevant clinical and non-clinical data about an investigational product. It gives investigators the information they need to understand the scientific rationale for the trial and to manage participant safety. It is required under ICH E6(R2) GCP guidelines for drug and biologic trials and serves an equivalent function in medical device studies.

    When should a sponsor prepare the investigator's brochure?
    The IB should be drafted in parallel with preclinical work, not after it concludes. Waiting until all studies are complete before starting the IB adds unnecessary time to your regulatory submission timeline. Draft the structure early and populate it as data becomes available.

    Does the investigator's brochure need to be updated during the trial?
    Yes. ICH E6(R2) requires that the IB be reviewed at least annually and updated whenever new information materially affects the risk-benefit assessment. Updated versions must be distributed to all active sites and ethics committees promptly.

    Is an investigator's brochure required for medical device trials?
    The IB as defined by ICH E6(R2) applies primarily to drug and biologic trials. For medical devices, the equivalent information is typically included in the IDE application or the Investigational Plan. That said, many medical device sponsors also prepare an IB-style document because ethics committees and international regulatory authorities often expect one.

    What happens if the investigator's brochure is incomplete at the time of regulatory submission?
    An incomplete IB can trigger requests for additional data from the regulatory authority or ethics committee, extending the review timeline. In jurisdictions where approvals can otherwise move quickly, a weak IB is frequently the primary cause of delays.

    How long should an investigator's brochure be for a first-in-human trial?
    For a first-in-human medical device or biologic trial, a well-constructed IB typically runs 30 to 80 pages depending on the volume of preclinical data available. The priority is completeness and clarity, not length. A concise, well-organized IB is more useful to investigators and reviewers than a lengthy one that buries the information that matters.

    Does the investigator's brochure need to be translated for Latin American trials?
    It depends on the country and the ethics committee's requirements. In some jurisdictions, an English-language IB is acceptable. In others, a Spanish translation is required. Sponsors should confirm language requirements for each operating jurisdiction before finalizing the document.


    The investigator's brochure is not a formality. It is the scientific case for why your trial should proceed and the practical guide that keeps investigators and patients safe once it does. Get it right before you start — and keep it current throughout. If you are planning a first-in-human program and want to understand how the IB fits into the full regulatory and operational sequence, bioaccess® works with sponsors from the earliest stages of trial planning.